This week we finished the optical alignment in the optical lab. We also mounted the NAS on the tower as a test. Then we pulled the NAS off the tower and mounted all the optics into the the NAS for the first time. Then we aligned the flowerpot (calibration point source) to the NAS and the board to the the flowerpot. See photos below

Laird bolting board on NASThe optical board on the NAS (flowerpot at top with calibration source)

A well aligned PWFS

The VisAO PSF at r'