The 2016B run is engineering. The 2017A run will likely be in February or March. It will be a shorter run (about 15 nights), and shared-risk due to the new AO and Clio detector upgrades. Hope this helps with your telescope proposals!
Love, MagAO
Home of MagAO and MagAO-X.
The 2016B run is engineering. The 2017A run will likely be in February or March. It will be a shorter run (about 15 nights), and shared-risk due to the new AO and Clio detector upgrades. Hope this helps with your telescope proposals!
Love, MagAO