This was, incredibly, a zero-viscacha day. It was quite windy, a bit chilly, and there may have been a viscacha conference (¿visconferencia?) in the next valley over.
Dr. Jared R. Males, MagAO-X field biologist, in search of the elusive wild viscacha. Or just stretching his legs after a long day of coding.
Meanwhile, in MagAO-X land, we continue pushing buttons on our computers and watching what happens. I promised a peek at the MagAO-X web interface, so here’s part of it… that no visiting observer will ever see!
While most of the web-based interface will be designed for the needs of guest observers, this screen is definitely an “authorized personnel only” deal. With it, you can remotely power on or off anything in the instrument! I was authorized by Jared to toggle the acquisition flip motor power on and off during testing.
While it was a zero-viscacha day, it was also a one-snake day! Jared encountered a juvenile Philodryas chamissonis on his run. This species is known locally as la culebra de cola larga. In a juvenile spirit, I feel I should share that this could be translated as either “long-tailed snake” or “long-butted snake”.
Also known as the “Chilean Green Racer”, according to some website, this species has actually made an appearance on the blog before! (Photo by Jared Males)
Following Emily’s theme of Firsts, and because I’m very unlikely to have the chance to attach this song to the actual first light post: “First Light” by Balmorhea.
Two days left on the mountain, and two people left from our group. This morning Laird, Amali, Emily, and Katie headed back to Arizona. That means that it’s just me and Jared here from the XWCL. I have another full day, while Jared remains until Wednesday—with only the video chats of Olivier Guyon (international astronomical man of mystery) for company.
We have returned from the “day and night” schedule to a more standard day schedule, which meant we were at breakfast to see them off this morning.
Emily, Amali, Laird, and Katie embarking on the bus ride down to El Pino. (Photo by Jared Males)
Today, I finished some network configuration and handbook updates; held hoses and ladders while Jared did some real work; and (mostly) worked on the MagAO-X “friendly” GUI. It’s still in need of formatting polish, so I’ll show you a screenshot some other time. Instead, behold the Desk of Penance.
Yes, I am reduced to propping my laptop on top of one of the instrument computers. It works okay, as long as you don’t mind back pain.
Among the things I held under Jared’s direction: a funnel and hose assembly for glycol dilution. Fancy astronomy instruments generate a lot of heat, and all their major components need liquid cooling (like a l33t g4ming r1g). Our cooling pump was not pushing coolant through as quickly as it should, and Povilas Palunas (Telescope Scientist here at LCO) suggested we might be viscosity (viscachity?) limited.
So, we replaced about 5 liters of glycol solution with distilled water, and now all our fancy components are happy again.
Containers of pink glycol solution, tubing, and a funnel on the floor of the LCO cleanroom.
Aside from that, no excitement to report. Which, compared to yesterday, is definitely a good thing.
The P.I. engages in chinchillid photography, a popular LCO pastime.
In compliance with Blog Rules 2019B-X, I present a foxy tune by Courtney Barnett: “Dead Fox” off of her 2015 album Sometimes I Sit and Think, and Sometimes I Just Sit.
Friends, this was supposed to be a celebratory blog post.
My web-based interface to MagAO-X is getting to the stage where it’s actually useful. My suitcase finally arrived from airline purgatory. I finished my SPIE 2020 abstract. I found out how to make the soda machine dispense plain fizzy water (my one non-caffeinated vice).
However, fate had other plans for this author.
One of the reasons for constant comings and goings of MagAO-C and MagAO-X personnel here at LCO is that the P.I. foresaw the need for periodic supply missions from Tucson, as the unpacking process gradually revealed what we’d forgotten to stuff in the shipping containers back in October. (Alas, that he could have foreseen what would befall poor Megadesk!)
Among my items to hand-carry was a monitor mounting plate from the exquisite quadruple monitor stand in our lab in Arizona to stand in for a missing part in the corresponding quadruple monitor stand in Chile.
Of course, LATAM and American conspired to lose the suitcase containing this, replacement clean-room booties, 3/8″ plastic tubing, Fruit Snacks for Kyle, MagAO-X hats and stickers, and all of my clothes.
(I set out from Tucson on Saturday, and by the time the suitcase caught up to me Wednesday afternoon I was likely offending staff and scientist alike with my single pair of jeans that were last considered clean five whole days ago.)
Naturally, as soon as the bag arrived, I gathered up all the MagAO-X special deliveries and ferried them to the clean room. A viscacha was perched above the loading dock—normally an auspicious sign.
In this case, however, it proved a dark portent—as I shall explain shortly.
This was also the end of the MagAO run, meaning it was time to remove from the telescope Clio2, VisAO, the MagAO Nasmyth unit, and the crown jewel—the MagAO adaptive secondary. Both extremely heavy and extremely delicate, its removal is a multi-person job involving many observatory personnel under the watchful direction of MagAO P.I. Laird Close. If you are concerned about the aforementioned omens, fear not—MagAO’s removal was a complete success! As I’ve blogged (and assisted) with this before, I’ll confine my comments to what’s new this time.
This afternoon was a first for MagAO-X and MagAO-C: two generations of Magellan adaptive optics systems (and their P.I.s) in the same cleanroom!
From left: MagAO ASM, Prof. Laird Close, Dr. Jared Males, and MagAO-X (behind the nitrogen tank) (Photo by Emily Mailhot)
But let us return to my shame, my downfall, the tragic demise of Megadesk-LCO. I slotted in the new brackets and attempted to affix all four monitors to the stand. The last one proved unable to fit, requiring some adjustment to the height of the arm that supports the three monitors arrayed horizontally.
The following conversation took place, somewhat portentously.
Me: “And this monitor stand—it’s not clamped to the desk, or anything?”
Jared: “No, it’s pretty stable with just the base plate.”
Me: “Wow, I need one for myself”
Jared: “Here’s the instruction manual. You finish up here; I have to go upstairs and finish a proposal.”
About five minutes later, the monitor mount was on the floor. You see, I made a classic blunder: forgetting about simple machines. When I removed the first monitor and turned to set it down somewhere safe, I didn’t consider the lever action of the horizontal mounting bar. With the mount in a partially disassembled state, its center of gravity went sideways… and so did it, slowly at first and then all at once.
There was one casualty, a 4K monitor in the lower right position that landed “buttered-side down”. Your author, appropriately mortified, informed the P.I.
Penance was assigned.
Anyway, we now have 0.75 of Megadesk. And an order for a new monitor.
To not end on a totally negative note, here’s a panorama I took on the road to the Magellans that would be ideally suited for a desktop background with the new three-up monitor arrangement.
The blog rules state today’s Song Of The Day must relate in some way to the last MagAO-C post’s song of the day (which was “Gangnam Style” by Psy).
They do not state the connection must be obvious.
Here’s “Essentially” by Japanese Breakfast (and no, I don’t think Psy is Japanese!)
Today, we handed MagAO-X off to the shipping contractor (all 2961 kg / 6527 lb / 3.26 tons of it). Our dinky little forklift was not up to the task, so Southwest Industrial Rigging Inc. was called in.
MagAO-X leaving the Steward Observatory loading dock under the supervision of riggers (center, right), grad students (behind camera), the P.I. (outside of frame), and Project Manager Victor Gasho (left).
Forklifts: not just for pallets any more.
Loading MagAO-X for its ride to Los Angeles (probably). (Photo by Kyle van Gorkom)
Oddly enough, three ton shipments get tracking numbers just like your Amazon order of cat toys. We’ll be updating the map below with information from our shipper.
2019-10-17 @ 12:25 — Pickup at Steward Observatory
2019-10-18 @ 07:57 — Arrived at warehouse / Phoenix Sky Harbor International Airport
2019-10-19 @ 13:06 — Booked on flight QT 4157 on Oct 27th from Miami to Santiago
2019-10-19 @ 14:11 — Arrived at warehouse / Los Angeles International Airport
??? — Arrived at Miami International Airport (seriously, we have confirmation on the phone, but nothing updated on the tracking page)
2019-10-29 — The tracking website dispenses new information: “SANTIAGO E.T.A.: 11/01/2019 02:30” (What does it really mean? Who can say. There’s no Avianca Cargo flight arriving then…)
Dr. Males claimed that he was going home to “not think about MagAO-X for a few hours,” but we know the truth. He fears for his child going through the rough world of international logistics. But sometimes, you need to… Go Outside (by Cults).
Last Friday, MagAO-X underwent a pre-shipment review. This is the process by which the Magellan Observatory ensures that we won’t waste everyone’s time by shipping our instrument to the telescope. It’s a multifaceted process, evaluating everything from “does your instrument work in the lab?” to “have you baked your shipping crate?”
I’m happy to report that we’ve cleared this hurdle, meaning we’re taking MagAO-X to Chile for the 2019B* run! Many thanks to all of our reviewers and the observatory staff for productive discussions and suggestions. We look forward to getting on sky with MagAO-X this December! (Since this is the MagAO blog as well, it bears mentioning that we’ll be there in November too.)
* We use ‘A’ and ‘B’ to refer to the former and latter halves of the year, since “winter” means different months depending on your hemisphere.
Also, this means Jared feels it’s finally acceptable to hand out the 2019B mission patches I designed:
Sunset scene with viscacha and diffraction spikes
The patch depicts a viscacha, one of the local fauna of Magellan, perched on a rock at sunset. (As they do.) In the sky above, a point source is diffracted by some telescope spiders to form a stylized Magellan PSF. (Or possibly a MagAO-“X”.)
As long as I don’t run out of South American animals, I plan to do a patch for every run. Then I’ll put them all on a vest and look like the world’s nerdiest boy scout.
Part of being in the XWCL is following the P.I.’s rules:
No unauthorized use of the label maker
No coding in MATLAB
No circus activities
No volunteering for Olivier
No metric shit running around in the lab
Every post must have a song of the day
No unauthorized use of the label maker
I regret that I forgot rule #6 in my last post, so I will take this opportunity to rectify my mistake with two songs of the day.
I’ve been digging this song about not being too hard on yourself by Alex Lahey:
And if I had been thinking about a song of the day for the back-to-school post, it might have been “Restart” by Little Daylight: